We are proposing to develop Stonestreet Green Solar on land near Ashford in Kent.
The proposed development comprises the proposed construction, operation, maintenance and decommissioning of a renewable energy generating project. The proposed development will include solar PV arrays and on-site energy storage, together with associated infrastructure and an underground cable connection to the grid.
The project will have an export capacity of up to 99.9MW, which is enough renewable energy to power approximately 42,000 homes and saving approximately 34,000 tonnes of carbon from the atmosphere each year. The project has secured nearby grid connection access at Sellindge.
As the proposed generating capacity exceeds 50 megawatts (MW), Stonestreet Green Solar is classified as a Nationally Significant Infrastructure Project (NSIP) under Sections 14(1)(a) and 15(1) and (2) of the Planning Act 2008. Our project therefore had to apply for a Development Consent Order (DCO) through the Planning Act 2008 process. Consent for the solar panels, energy storage, cable routes and grid connection were included in the DCO.
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
Solar Farm Components
- 1 Solar Energy
- 2 Fencing
- 3 Solar Panels
- 4 Inverter (DC to AC power converter)
- 5 Landscape Area
- 6 Substation
- 7Energy Storage
- 8 Underground Cable
The benefits of Stonestreet Green Solar
In this era of Climate Emergency and growing costs of energy, Stonestreet Green Solar will provide a range of benefits including:
The project will export up to 99.9MW of clean, renewable electricity, contributing to the UK’s 2050 net-zero target.
This renewable energy generated will be sufficient to power almost 42,000 homes, saving over 34,000 tonnes of carbon from the atmosphere each year.
The project will include energy storage onsite, which will enable the storage, import and export of electricity to and from the grid. The project will generate subsidy-free electricity, without public financial support.
The project will provide an inflation-linked community benefit fund for the lifetime of the project to be used locally for social and environmental projects.
During the lifetime of the project, the biodiversity of the site will be greatly enhanced and the soil condition will be improved.
In addition to the overall benefits of the project, we also want our proposals to have a positive impact locally, especially for the community and the local environment, including delivering a significant biodiversity net gain, creating new paths for walking and cycling in the area as well as new areas for the public to access, and making a direct contribution locally through a Community Fund.
Why this site?
The Stonestreet Green Solar site has been selected as it meets all the key criteria for a development such as this:2. High levels of sunlight (irradiation) given its South-East location means that the land required for the same output is less than it would be in other parts of the country.
3. No statutory landscape, heritage or ecological designations on the site. No significant cultural designations.
4. Topography and existing hedgerows will help to minimise the visual impact of the project from Aldington and other viewpoints.
5. Adjacent to pre-existing infrastructure including HS1, the M20, the Sellindge electrical substation and overhead lines.
6. Proximity to local large energy users provides the opportunity for a direct connection to provide renewable power locally.
7. Predominately lower grade agricultural land. Removal of this land from intensive farming use will reduce nitrate impact on the East Stour River and surrounding waterways.
8. Good access, being located close to the M20/A20.